An Aelieve Website Uncategorized 82

Explore Our Projects

South Slop Switching Building Expansion

The client engaged with City to build around the original structure to withstand an F5 tornado.

South Slope

South Slop Switching Building Expansion

The South Slope project was unlike any other. An existing wood structure building contained equipment that could not be shut down during construction. The client engaged with City to build a precast building around the original structure that could withstand an F5 tornado. The construction consisted of caissons with grade beams positioned atop. Tornado-proof doors and frames were installed, and new mechanical and electrical equipment allows South Slope to expand its switching capacity in the future.

Project Info

Related Projects

cityhighwest4
Iowa City West High School
A renovation of the entire HVAC system, window replacements, a small addition and other renovations.
Burge Market Place UI-01
Burge Dining Hall
Renovation of the Burge residence hall marketplace dining area for the University of Iowa.
booneexteriorpic
O’Brien McDonald’s Headquarters
Interior build of a 5,000 Square Ft office space for the franchise headquarters.